<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic RE: Selection of RPA Project, Feasibility in Product Forum</title>
    <link>https://community.blueprism.com/t5/Product-Forum/Selection-of-RPA-Project-Feasibility/m-p/59301#M12982</link>
    <description>Hi Rahul,&lt;BR /&gt;&lt;BR /&gt;You have covered all the basic points, few more points that you can add are:&lt;BR /&gt;&lt;BR /&gt;- Security and compliance challenges if any (This could include determining session locks of application along with credential storage determination)&lt;BR /&gt;- Check if any differences are there in the applications in DEV and PROD like unknown popups or different links etc.&lt;BR /&gt;- Determination of retry points in each screen (from my pervious experience, it's better if you can identify it at this stage only otherwise to avoid unknown surprises in DEV)&lt;BR /&gt;- Loading time comparison between each environment (DEV, UAT and PROD). This gives a rough idea about the average time you can consider for timeouts in you process flow.&lt;BR /&gt;&lt;BR /&gt;------------------------------&lt;BR /&gt;----------------------------------&lt;BR /&gt;Hope it helps you and if it resolves you query please mark it as the best answer so that others having the same problem can track the answer easily&lt;BR /&gt;&lt;BR /&gt;Regards,&lt;BR /&gt;Devneet Mohanty&lt;BR /&gt;Intelligent Process Automation Consultant&lt;BR /&gt;Blue Prism 7x Certified Professional&lt;BR /&gt;Website: &lt;A href="https://devneet.github.io/" target="test_blank"&gt;https://devneet.github.io/&lt;/A&gt;&lt;BR /&gt;Email: devneetmohanty07@gmail.com&lt;BR /&gt;&lt;BR /&gt;----------------------------------&lt;BR /&gt;------------------------------&lt;BR /&gt;</description>
    <pubDate>Thu, 06 Jan 2022 14:09:00 GMT</pubDate>
    <dc:creator>devneetmohanty07</dc:creator>
    <dc:date>2022-01-06T14:09:00Z</dc:date>
    <item>
      <title>Selection of RPA Project, Feasibility</title>
      <link>https://community.blueprism.com/t5/Product-Forum/Selection-of-RPA-Project-Feasibility/m-p/59300#M12981</link>
      <description>What are all points need to be considered while doing a Technical feasibility study of a RPA project.&lt;BR /&gt;&lt;BR /&gt;
&lt;UL&gt;
&lt;LI&gt;Spying few elements of the application to check if we are able to spy elements of an application with any spy modes.&lt;/LI&gt;
&lt;LI&gt;Turn around time calculation and meeting TAT Time.&amp;nbsp;&lt;/LI&gt;
&lt;LI&gt;Peak hour performance challenges.&lt;/LI&gt;
&lt;LI&gt;scalability.&amp;nbsp;&lt;/LI&gt;
&lt;/UL&gt;
&lt;BR /&gt;What are other points you consider while doing technical feasibility study before giving a go to development call?&lt;BR /&gt;&lt;BR /&gt;------------------------------&lt;BR /&gt;Rahul Vyas&lt;BR /&gt;RPA Developer&lt;BR /&gt;BNP Paribas&lt;BR /&gt;Asia/Kolkata&lt;BR /&gt;------------------------------&lt;BR /&gt;</description>
      <pubDate>Thu, 06 Jan 2022 13:46:00 GMT</pubDate>
      <guid>https://community.blueprism.com/t5/Product-Forum/Selection-of-RPA-Project-Feasibility/m-p/59300#M12981</guid>
      <dc:creator>RahulVyas</dc:creator>
      <dc:date>2022-01-06T13:46:00Z</dc:date>
    </item>
    <item>
      <title>RE: Selection of RPA Project, Feasibility</title>
      <link>https://community.blueprism.com/t5/Product-Forum/Selection-of-RPA-Project-Feasibility/m-p/59301#M12982</link>
      <description>Hi Rahul,&lt;BR /&gt;&lt;BR /&gt;You have covered all the basic points, few more points that you can add are:&lt;BR /&gt;&lt;BR /&gt;- Security and compliance challenges if any (This could include determining session locks of application along with credential storage determination)&lt;BR /&gt;- Check if any differences are there in the applications in DEV and PROD like unknown popups or different links etc.&lt;BR /&gt;- Determination of retry points in each screen (from my pervious experience, it's better if you can identify it at this stage only otherwise to avoid unknown surprises in DEV)&lt;BR /&gt;- Loading time comparison between each environment (DEV, UAT and PROD). This gives a rough idea about the average time you can consider for timeouts in you process flow.&lt;BR /&gt;&lt;BR /&gt;------------------------------&lt;BR /&gt;----------------------------------&lt;BR /&gt;Hope it helps you and if it resolves you query please mark it as the best answer so that others having the same problem can track the answer easily&lt;BR /&gt;&lt;BR /&gt;Regards,&lt;BR /&gt;Devneet Mohanty&lt;BR /&gt;Intelligent Process Automation Consultant&lt;BR /&gt;Blue Prism 7x Certified Professional&lt;BR /&gt;Website: &lt;A href="https://devneet.github.io/" target="test_blank"&gt;https://devneet.github.io/&lt;/A&gt;&lt;BR /&gt;Email: devneetmohanty07@gmail.com&lt;BR /&gt;&lt;BR /&gt;----------------------------------&lt;BR /&gt;------------------------------&lt;BR /&gt;</description>
      <pubDate>Thu, 06 Jan 2022 14:09:00 GMT</pubDate>
      <guid>https://community.blueprism.com/t5/Product-Forum/Selection-of-RPA-Project-Feasibility/m-p/59301#M12982</guid>
      <dc:creator>devneetmohanty07</dc:creator>
      <dc:date>2022-01-06T14:09:00Z</dc:date>
    </item>
  </channel>
</rss>

