yanchogerdjikov
Level 2
since ‎09-12-19
‎18-03-24

User Statistics

  • 1 Posts
  • 0 Answers
  • 0 Likes given
  • 0 Likes received

User Activity

Hi everyone!We need to use SAP batch jobs as a trigger for a process. The batch jobs are scheduled in TWSC. Is there a way to use the batch job status as trigger for the BP process? Thanks!