02-03-21 08:34 PM
12-04-21 12:25 PM
Hi Kristy,
Glad to hear you're enjoying using Capture 2.0!
3.4 Process Exceptions is included in the PDD as an area for the user to manually include details of any exceptions in their process.
To align with the logic of Process Studio, decision points in Capture will be adjusted based on the number of connections when exported to .xml format:
For 1 connection - decision point is converted into a Link.
For 2 connections - decision point will remain as Decision node. Connections will be overwritten with Yes/No to align with decision node logic.
For 3+ connections - decision point will convert to a Choice node with a "floating" Otherwise node.
Thanks,
Rhys
12-04-21 03:56 PM