Hi , I have 2 schedules with different timings. Is there any way , i can start a second schedule if my first process (which is in first schedule) completed earlier than the expected end time. Basically , i want to pre-pone my second schedule(not manually) , if the first one finished early  
1 REPLY 1

Denis__Dennehy
Level 15
What you can do is have multiple tasks within the same schedule - and then set the On Completion/On Exception option for the first task to be to run the second task.   The guide to scheduler should be part of the training path for anyone taking on a controller/ops role: http://portal.blueprism.com/system/files/2017-09/Blue%20Prism%20-%20Guide%20to%20the%20Scheduler.pdf