24-09-20 09:02 AM
07-09-23 11:43 PM
Thanks you for providing guidance Jarod.
I am almost there except few doubts:
1st DOUBT / QUESTION:
I tried this but getting error message while loading schedule name through DRM-Process Launcher
Step 1: Updated the Schedule Matrix as below
Step 2:
Run the DRM- Configurator
Step 3:
Step 4:
Run process DRM Process Launcher and got exception.
Error Message: Exception: Invalid Process Name: [SLA Test Process 05] in Schedule [SLA Test Schedule 02] .Please validate
Do I need to provide all parameters (Schedule Name, Process Name, Index, SLA) values again in Process Launcher while loading ? Since I already gave values in Schedule Matrix.csv
2nd DOUBT / QUESTION:
Could you please give me an example how I use VIP SLA for high priority process?
Thanks
Subhani
08-09-23 05:18 PM
Hi Jarod,
for my 1st question above I added process names in Process Mapping.csv as well then it resolved exception and then SLA Test Schedule 02 loaded into Process Controller Queue.
But when I run the DRM-Process Controller process
Expecting behavior : it should execute as per Schedule Matrix.csv entries (like On completion of first process (SLA TEST PROCESS 05) next process (SLA TEST PROCESS 01) then next process (SLA TEST PROCESS 04) then next (SLA TEST PROCESS 03).
But it is just executing 1st Process SLA TEST PROCESS 05 and not moving to next process.
can you please guide me what I am missing here ?
and also
2nd DOUBT / QUESTION:
Could you please give me an example how I use VIP SLA for high priority process?
11-09-23 03:17 PM
Hello Subhani,
I'm glad to learn that you are making progress!
Regarding the Schedule Matrix:
Regarding the VIP SLA:
Here is an example:
When you have more resource demand than available licenses/resources, this mechanism will try to allocate resources to satisfy the process with the closest target completion time. The rest of the processes will evenly get resources even though there might not be enough resources to meet all SLAs. Once the VIP process is completed, the process with the second closest target completion time will become the VIP process and get all released resources.
13-09-23 06:50 PM
Thanks a lot for the explanation, Jarod.
Sorry I am bothering you with more questions which I am getting the deeper I am experimenting the more questions I am getting 🙂
21-09-23 02:03 PM
------------------------------
Jarod Yang
Senior Consultant | BluePrism
------------------------------
01-11-23 02:04 AM
Thank you Jarod for your valuable responses.
I've one question regarding DRM connection directly to database about this point, my companies audit team not allowing to connect DB directly. So is there any alternative way to get the resource PC / session status from AppServer ? just like the way IC connecting app server.
Please guide me in this regard.
01-11-23 03:35 AM
The easiest way is to run DRM on the Application Server. DRM consumes very little RAM and CPU, and the Application Server should already have a connection to the SQL DB. If your Application Server is using Windows Authentication for the SQL connection, you don't even need to create the bpdbreader account, instead the DRM will automatically switch to Windows Authentication mode to connect to the DB.
02-11-23 10:08 PM
Can you direct me to the use case and need for DRM?
08-11-23 01:43 AM
These are the common use cases of customers using DRM:
• Dynamically allocate Robots to work on processes based on their SLAs
• Dynamically allocate available Robots to run scheduled tasks
• Login/Logout machines to run scheduled tasks
• Scheduled tasks stuck in "Pending" state
• Robots stuck in "Warning" state
• Network issue causing processes terminate on Robots
• Low license utilization due to schedule disruptions or running processes on dedicated machines
• Trigger and monitor tasks without installing Blue Prism
13-01-24 04:45 PM
Hi @Jarod Yang,
I am trying to use this DRM process and facing some challenges while running it. Could you please help me to fix it?
Process: DRM-Process Controller (without Interact Features)
Object: Resource Status Update
Action: Resource Busy? (GET)
Stage: Runtime Resource GET (HTTPS)::Busy
Error: Failed to authenticate the user.
It is failing to execute this stage to get the resource status.
By the way, we are using BluePrism SSO and Windows authentication for the database. Given the user name and password that have access to DB and used Windows authentication. Port 8199 for connection. Getting the even after changing the port from 8181 to 8199
__PRESENT
__PRESENT