I think 2 very important enhancements are required -
a) When we rename or change a data item, we have to manually change the old references for those data item in all the stages where it's used.Instead of doing this manually BP should automatically replace the previous references in all the stages.
b) Right now we have to manually select all the required process/ Objects/Env var etc while creating a package. There should be a way that either Blueprism drags everything related to a project item or we should be able to visually see the dependencies while creating packages.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.