Hi,
I have scheduled a process in Lower environment (DEV) and the same in Higher environment (PROD).
In DEV, the scheduler works properly, but it fails with the following error message in PROD (while checking the scheduler log).
"Resource XXXXXXXX : Timed out waiting for valid connection"
If I manually drag the process to a resource in the control room, the process runs fine.
But fails to kick off if I schedule the same process on the same resource.
Please refer to the attached image.
I have verified that all the scheduler settings in Blue Prism are the same for both the environments.
Can Somebody please help me out finding a solution for this?