University Forum
Upskill together with other SS&C Blue Prism learners. Share your learning objectives, get advice on courses and celebrate your latest certifications.
cancel
Showing results for 
Search instead for 
Did you mean: 

Forum Posts

Resolved! Certified Developer Certificate validity

Hello! Could someone tell me, how long is the Blue Prism Certified Developer certificate valid? (The certificate validation site does not say anything about the validity of my certificate obtained in October 2019.) Thanks a lot!RegardsRoberto--------...

Latest Update on ROM Architect Certification

Latest Update on ROM Architect Certification: The ARA01 exam will be retired at the end of 2020. Blue Prism University is updating the ROM Architect Exam. With the latest changes to the ROM training course, we are replacing the existing ARA01 exam wi...

Anonymous by Not applicable
  • 92 Views
  • 2 replies
  • 7 likes

Dynamically change part of code in Code stage

Hi,I have a Code stage that creates Pivot Table in Excel. The first part of the code is general and the second part is there to describe how the Pivot Table should look like. I would like to be able to dynamically change the second part whenever I wa...

Resolved! Process takes longer

I have two process and two run time resource, each executes a process.Process 1 scheduled to run every hour and allocated to one runtime resource- one which loads the item into the queueProcess 2 scheduled to run every hour and allocated to another r...

Resolved! Multiple Run Time Resource

Hello,I designed three process and i would like to allocate each process to a run time resource. LikeProcess 1 -> Run time Resource 1 -  loads the item to queue 1Process 2 -> Run time Resource 2  - process the item and load to queue 2Process 3 -> Run...

Resolved! Scheduler

Hello,I have a situation where i want to create a scheduler to load a process from 8am to 4pm, every 1 hour. In that, i want the Blue Prism to check if the scheduler is executed for the first time in a day, then it will send a Process initiation noti...

Need active hyperlink in results element in VBO

Hi all,This one is frying my brain. I've created a process hoping to end up with a list of hyperlinks in an Excel sheet. Process works, but the links are plain text rather than active links to a document. What am I doing wrong?Ideallly instead of a h...

Get Terminated Sessions

Hello.I need to get a list of terminated sessions from control room for using from external resources. Is there a possibility to do it with Data Gateways or otherwise?------------------------------Anton KashevatskyiConsultantEYEurope/Kyiv------------...

Resolved! ROM Architect (ARA02) - Information needed

I am preparing to take ROM Architect certification and already scheduled to take ARA01 exam. I just discovered there is a new test ARA02 available. What is the difference between ARA01 and ARA02? Different study materials? Exam question? I tried look...

Resolved! Foundation Training - bprelease run task

Hi there,The material for the setup task to import release shows a step to load queue, and run. I don't get to the process page shown in the instructions and there's no run button. This is what I see. I tried the create process step as well and it's ...

34043.png