25-05-22 02:34 AM
01-06-22 02:07 PM
02-06-22 01:34 PM
03-06-22 03:25 AM
Initially, the schedule was set as below and working fine.
Process (Preparing) : It is a process that checks RR’s status such as availability, connectivity etc. prior to run Process B.
Process (Main) : It is a main process.
For some reason, they formatted RR.B and re-installed BP.
After that, RR’s name is changed as the PC’s name changes.
So, they retired the RR.B and re assign the new RR, RR.B’ by replacing the old RR, RR.B
Like this.
After this, the issue has started happening.
When the Task 1 is triggered by the Scheduler A and B on RR.A, RR.B’ is triggered.
When the Task 2 is triggered by the Scheduler A and B on RR.A, RR.B is triggered. (and gets an error in the Schedule Log says “RR.B is offline”) <- because RR.B is retired.
It seems like RR.A in the schedule is addressing the new one, RR.B’
And RR.B in the schedule is addressing the retired one, RR.B
So, I guided them to completely remove the existing schedules and re-create them.
Here’s the new Schedule.
Thanks.
03-06-22 11:12 AM