Status:
Under Consideration
Submitted on
11-11-19
10:50 AM
Submitted by
MarcoMatuttis1
on
11-11-19
10:50 AM
Would be great to have a hotkey for this because when you have a bug in your process sometimes you are stuck in "step out" so that I only can use the taskmanager to end the automate.exe
... View more
Moved:
Conditional wait
Submitted on
11-11-19
10:46 AM
Submitted by
robert.nicklin
on
11-11-19
10:46 AM
This post has been moved. Click the link to continue the conversation.
Status:
Planned-Later
Submitted on
11-11-19
10:37 AM
Submitted by
MarcoMatuttis1
on
11-11-19
10:37 AM
Control Room / Application Server should be able to send E-Mails if a Process Terminates. In my eyes a must have feature for unattended Bots. When I leave work and the Robot terminates after some minutes there are so many hours of runtime lost. If I would get an E-Mail I could simply start the bot again or fix the issues remotely.
... View more
Status:
Not Planned
Submitted on
10-11-19
10:07 AM
Submitted by
WimVan_de_Velde
on
10-11-19
10:07 AM
Hi, It would be nice to be able to detect and modify the status of a work queue (running/paused) from within a vbo. Also a filter on any kind of "get items" from that queue would come handy, because now you get all the items, even if the queue is in pause. Kind regards, Wim VdV
... View more
Right now if any element is not found in Read, Write or navigate stage , an error message is shown like" Unable to perform xxxxx in Step x....". I think if the element not found is automatically highlighted in the application modeler would be a great time saver. I think Open Span has a similar functionality.
... View more
Status:
Not Planned
Submitted on
07-11-19
05:41 PM
Submitted by
BhagavathsinghR
on
07-11-19
05:41 PM
Issue: *Runtime Resource Blueprism Listener is facing out of memory exception when the listener memory exceeds 1.5 GB. *The memory of the Listener is increasing because of the runtime resource logs. *Since the Logs include connection logs of all the runtime resources listening to same server Ref Tkt Number : 75620 Solution: * Disable/Enable option for the runtime connection logs * Utility or command to release the log memory remotely.
... View more
We need to be able to normally delete (NOT hide, retire or sth like that, but to delete) old business objects and processes without corrupting database
... View more
Status:
Needs More Info
Submitted on
06-11-19
05:14 PM
Submitted by
Dawid.Pekala
on
06-11-19
05:14 PM
Just like it is possible with process logs, it would be great to see an option to added to archive off work queue items. It could be as simple as a tickbox within log archiving to include queue items or (even better) as an entire separate archiving subrouitne, so it can run on separate schedule.
... View more
Status:
Not Planned
Submitted on
05-11-19
04:45 PM
Submitted by
Manoj_kumarNunn
on
05-11-19
04:45 PM
Hi, It will be good to have a configuration setting to avoid runtime resources to look for a connection when they are offline. Currently in Control room these runtime resources shows as "Missing" status when the BOT machine is shutdown or offline for some reason. We are planning to implement a cloud based solution for Blue prism bots to start machine and stop machines automatically. When the machine stops, the relevant runtime resource shows as "Missing". It may help if we have a configuration setting to stop runtime resource to look for a connection in this scenario. Thanks, Manoj
... View more
Status:
Not Planned
Submitted on
05-11-19
09:25 AM
Submitted by
MariusBalukevic
on
05-11-19
09:25 AM
Help is not being updated with newest release functionality updates and examples
... View more
Extend Action Stage to dynamically call OBJECT/METHOD from a BO Use case: An actor validates medical provider licenses are current. To do this the actor must perform browser navigation to different medical board websites depending on state, provider type and specialty. The same data needs to be scrapped from all the websites (Provider Name, license start date, license expiration date). Classic RPA problem. Check If an Action Stage could dynamically call OBJECT/METHOD from a BO, the maintenance of implementing this could be simplified by flattening this (eliminating decision tree) through tabling an interface implementation. Build a Collection with the following columns: Lookup, Object, Method Stage that calls Collection Manipulation BO to get row by Lookup Column Stage that dynamically calls BO using OBJECT/METHOD returned from look up The next question is how to handle input/output parameters of stages that dynamically call OBJECT/METHOD? Pass one row collections (basically list of name value pairs).
... View more
Status:
Under Consideration
Submitted on
31-10-19
04:53 PM
Submitted by
DominiqueDALLER
on
31-10-19
04:53 PM
The application modeller accepts that different elements in the application modeller of a given BO have the same name. For maintainability purposes, this should be forbidden.
... View more
Status:
Not Planned
Submitted on
31-10-19
04:50 PM
Submitted by
DominiqueDALLER
on
31-10-19
04:50 PM
The BP compare tool (BP 6.5.0) is currently unable to compare the application modeller part.
... View more
Status:
Not Planned
Submitted on
31-10-19
04:48 PM
Submitted by
DominiqueDALLER
on
31-10-19
04:48 PM
While upgrading our BP platform (up to 6.5.0), I have checked the BO provided with the new version with the previous version, for example the VBO MS Excel. After some errors in our customized VBO MS Excel, I have discovered that the BP compare tool doesn't take in account the initialize page. Perhaps the same with the clean-up action.
... View more
Status:
Needs More Info
Submitted on
31-10-19
04:36 PM
Submitted by
DominiqueDALLER
on
31-10-19
04:36 PM
The view functionality in the studio is too far limited. If I open a process or BO in view mode, my objective is to open it for READ ONLY purpose. I still want to be able to use all the other functionalities, like using the expression validation, advanced find, and so on. So the view functionality would be more useful as a read-only mode, instead of a no edit mode.
... View more
To be able to tackle performance issues, the Blue Prism log should take in account the duration of each stage. Firstly, the Blue Prism log should display the duration of each stage in the log, not just the 'resource start' or 'resource end'. And as some stages are unseen given the log settings, the Blue Prism log should include at the end, the duration of all unseen stages, and the total duration of the process. Secondly, Blue Prism should include a setting to display a stage in the log if its duration is greater than a defined value (in the system). For example, all stages with duration greater or equal than 30 seconds are displayed in the log, even if the setting in the studio is none or error only.
... View more
I think 2 very important enhancements are required - a) When we rename or change a data item, we have to manually change the old references for those data item in all the stages where it's used.Instead of doing this manually BP should automatically replace the previous references in all the stages. b) Right now we have to manually select all the required process/ Objects/Env var etc while creating a package. There should be a way that either Blueprism drags everything related to a project item or we should be able to visually see the dependencies while creating packages. Regards,
... View more
It would be great to enhance the existing capability to review references to a process or an object in the following way: to enable it both ways, meaning that you are not limited to view processes and/or objects that call the selected item, but also vice versa to view all processes and/or objects that the selected item calls itself (particularly useful to review upon release build if all required items are included) to have a full visual mapping of all references and dependencies, not just a simple list
... View more
It would be great to add a simple confirmation prompt before final deletion of a schedule in the control room. As there is no such prompt as of now and the option to delete a schedule is right next to the option to retire or unretire them, this happens quite frequently to our operators.
... View more
Status:
Duplicate
Submitted on
28-10-19
10:59 AM
Submitted by
RobynSinglehurs
on
28-10-19
10:59 AM
Would be good to be able to stop all schedules from running so that if you want to halt the system (upgrade, urgent service window) you can stop all schedules from running rather than having to go through them all one by one stopping them. Allow them to end gracefully and then be able to restart them all rather than having to start them individually as well.
... View more