Showing ideas with label Blue Prism RPA.
Show all ideas
HI Team, I want to export work queue data for a particular work queue using BP work flow not by exporting it manually. I have tried the internal VBO work queue object --> get report data option in it .It is only giving the item id not the entire queue export for the given work queue to the collection. Kindly guide me in this and if any pdf is there then please provide me. Thanks
... View more
Hello! When building objects and processes you sometimes realize you missed to place an action. The intuitive way for me to add an action earlier in the object/process: Select what needs to be moved to make room and move it. Place the new action where it is supposed to be. Configure the action. Draw new connecting line. Step 2 is not possible in the way the tool works right now. If you drag a new action and place it on a line between two other actions, it simply disappears. Currently I place the action next to the line. Then drag it on top of the line and then finish the steps. Please allow us to place actions directly on top of the connecting lines.
... View more
Status:
Not Planned
Submitted on
17-12-19
01:06 PM
Submitted by
Walter.Koller
on
17-12-19
01:06 PM
There should be a queue showing which schedule is currently running and which tasks have been processed or are still being processed. Running schedules should be able to cancel. Currently only server service restart is the only option to kill running schedules
... View more
Currently the Blue Prism Application server cannot be load balanced (use F5 for example). We are required to have 1 server hot and the second cold (service stopped). We should be able to run hot/hot, that is both application servers active at the same time.
... View more
Extend Action Stage to dynamically call OBJECT/METHOD from a BO Use case: An actor validates medical provider licenses are current. To do this the actor must perform browser navigation to different medical board websites depending on state, provider type and specialty. The same data needs to be scrapped from all the websites (Provider Name, license start date, license expiration date). Classic RPA problem. Check If an Action Stage could dynamically call OBJECT/METHOD from a BO, the maintenance of implementing this could be simplified by flattening this (eliminating decision tree) through tabling an interface implementation. Build a Collection with the following columns: Lookup, Object, Method Stage that calls Collection Manipulation BO to get row by Lookup Column Stage that dynamically calls BO using OBJECT/METHOD returned from look up The next question is how to handle input/output parameters of stages that dynamically call OBJECT/METHOD? Pass one row collections (basically list of name value pairs).
... View more
feature to create and save a connection between process and bot machine will help to get rid of dragging processes on bot machine by scrolling through the long lists of bot machines, feature can be introduces as a schedule without any timing, but can be ran manually whenever required
... View more
There is a problem with Blue Prism ver 6.4.2 that the combo box is not recognized as a combo box, and clicking on an item in HTML mode cannot select it.
... View more
Moved:
Export of User Role
Submitted on
06-08-19
12:45 PM
Submitted by
robert.nicklin
on
06-08-19
12:45 PM
This post has been moved. Click the link to continue the conversation.
When we went through the initial process of being sold Blue Prism we were told that we could slow down our processes so that our customers didn't necessarily need to know that we were using RPA to work their websites. It was only once we went through the initial training that we were told the only way to do this was to build in wait stages throughout our process. Could we not have a speed slider against the process, like we do in debug mode? For external processes we can then slow it down, but without having to factor in wait stages.
... View more
Context: Mechanism to store encryption key (DB and App server File System) and protecting it from system administrator against misuse. Use case: 1 Currently, encryption key and encrypted data both are stored in db, By virtual of Blue Prism design, encryption key can be stored in database or File System (FS) on App Server. No other option is available. 1. DBA access: We can move encryption key to App server and restrict dba access to app server. 2. Wintel / Blue Prism administrator access: They would have access to App server FS, wherein they also have access to Blue prism database (limited access though) for maintenance activity. This is causing issue. Requirement:The requirement is to store encryption key in any other tool (like IBM PIM - Product Information Management), where administrator should not have access to. Use case 2: When user navigates to encryption key using Blue Prism user interface, the log is also not recorded. Requirement: I believe this is essential for any audit compliance.
... View more
Submitted on
17-07-19
09:12 AM
Submitted by
robert.nicklin
on
17-07-19
09:12 AM
This post has been moved. Click the link to continue the conversation.