While debugging, if there is an option to export the current collection values to excel will help in analysing the collection data. Thanks!
... View more
When doing an Undo to reverse a newly made change in a process or object, the focus remains on the current page rather than moving focus to the page where the Undo is executed. This is very confusing when doing a number of Undo's in a row in order to reverse a list of changes made. When executing an Undo, the Studio editor should move focus to the page where the Undo will be done. Happy coding! Paul Sweden
... View more
When opening a CSD, launch a process, run a search, create a relationship, or create work in the modern processor workspace, it always opens to the same default window size, with is generally too small.
A good example of a process that is impacted is the Caller Authentication guided process, which is run by the GIDS phone team for every single phone call. Currently, the associate would have to resize the window for every single phone call.
There appears to be a couple needs here:
Windows for work objects should open to the size of the CSD or workflow form, or maximum window size.
When we resize a work type, it should retain that size for all instances of the same work type. Currently, Chorus only retains it for the specific instance that was resized.
Search results and relationship windows should retain their preferred size for new searches/relationships. Also, the default size should be at least large enough to display 3 or 4 items.
... View more
I observed that the Click Action in Navigate stage doesn't works after spying any element(Like Button) in Browser mode in Blue Prism V6.9.0. The Spying works perfectly all the time, Even the verify action in Navigate stage also highlights the element perfectly at Run time but when executing the click action, it seems like clicking at the top left corner of the screen in that particular application. Please check for this possibility in current and upcoming versions.
... View more
We are working on automating a few use cases through Decipher. For some of them, we don't require any manual intervention and therefore we need the Batch to bypass Data verification tab, whereas for others we need the manual intervention to be performed by the business users, and therefore the data verification tab needs to be turned on. However with the way the current configuration settings work, once we turn on the automatically skip data verify tab, the setting becomes applicable for all the batches. We would like the ability to enable/disable this setting based on the exact use case/batch as per the business requirements.
... View more
Status:
Planned-Later
Submitted on
11-11-19
10:37 AM
Submitted by
MarcoMatuttis1
on
11-11-19
10:37 AM
Control Room / Application Server should be able to send E-Mails if a Process Terminates. In my eyes a must have feature for unattended Bots. When I leave work and the Robot terminates after some minutes there are so many hours of runtime lost. If I would get an E-Mail I could simply start the bot again or fix the issues remotely.
... View more
Blue Prism should include recommended Process/object templates when we do fresh installation of blue prism. So that Users/Entry level developers will understand how a process should be designed. Other Vendors has already these type of templates eg. Background process Template, Robotic Enterprise Framework. It would be great, if blue prism provides these similar templates as per their standards.
... View more
When an item is deferred while waiting for an update or a response it would be much more useful to wake the item up earlier than the defer date. As an example, a case comes in and needs a human to verify some details - we need to defer the case so that it will be captured in an output file of the number of cases worked so the case would be deferred for 24-hours to ensure it gets reported. The issue that then happens is that if the return from a colleague is before the defer time ends you are not able to pick the case back out of the BP queue. In most common work flow systems you can pend/defer cases for a set period of time but also wake that case back up sooner if the required updates have come back so it would be much better to allow BP to do the same
... View more
Instead of creating separate schedules, when a schedule is completed ,it should trigger another schedule.
... View more
It would be great to be able to add a screenshots to the objects for reference and be able to print the object information to a document with screenshots.
... View more
My team and I have mentioned several times amongst ourselves that it would be great if BluePrism enabled the creation of folders for Schedules and Packages. Now that our team has been building processes for several years our list of Schedules and Packages has gotten quite large and the ability to folder these processes would be a huge help in cleaning up a large list.
... View more
I would like to have a menu setting that can be used to disable/enable the 'Don't log parameters on this stage' option for the selected stages/all stages - similar to the options for the log levels.
... View more
The idea is to have a list of weekdays (Mon-Sun) to select from when specifying the time plan for a Schedule. This way it is easy to let a Schedule run eg every Mon, Wed of a week. This is an enhanced version of the current 'weekly' time plan, where only one day can be selected. Currently (BP v6.9 for us) there are two options to achieve several runs on different weekdays: - create weekly schedule and duplicate for each weekday - create a new calendar and select the wanted weekdays only Both ways are not very intuitive and more difficult to maintain
... View more
The 'Web API Services' setting allows for specification of custom headers for a REST call. Being able to do this in the 'SOAP Web Services' setting would be very helpful for our use case as we use custom headers to call all web services through Datapower. As of right now, we need to create custom VB code to call SOAP services with custom headers. This would save a large amount of development time on our end to use Blue Prism's built in web service capability.
... View more
Please add button to clear unused dataitem through out the process at the time of development. Some time for big process flow development we left some unused dataitem in the process itself, it will be helpful if there is some clear option in the process studio for unused items.
... View more
some findings on how task order is defined by BP can be found in my comment below In BP client Control tab, Schedules are ordered by their names and tasks according to their creation. Schedules can be arranged by structured names. The order of Tasks is defined by when they have been created that makes organizing Schedules unnecessary difficult over time. eg: Schedule: (numbers show the logical order) - Login (1.) - Process (2.) - Logout (3.) Now when adding a second process to be executed after the existing one it would look like: Schedule: - Login (1.) - Process (2.) - Logout (4.) - Process2 (3.) It would be better to order the Tasks by their names so order can be easily amended as needed by prefixes in their names.
... View more
Capture Creates a lot of value for creation of new PDDs and Digital workers, but how about the already delivered solution? Running a large-scale (now 5 Y old) CoE come with some documentational challenges.
What if there was a "plugin" which was activated to create a PDD. Using a combination of the BP process logic and screenshots and magically created "PDD" like output. Which could be used to actually see what the robot is doing - all to avoid the problem of outdated PDD.
... View more
For product out of the box searches - behavior between Classic and Processor workspace is different. Request to reinstate Classic to Processor (reference CS0022133)
... View more
Add a functionality in control room to send out an email in case a process terminated, went to warning or anything unexpected happened. It can be configurable. It just need an internal trigger to capture process status and it changes then check if it is terminated ,warning etc then add to email queue and asynchronously clear out the email queue.
... View more
The functionality for Auto Get Work is not available for the Integrated Portal through SmartDesk. Users are able to use Auto Get Work in stand-alone Portal and they would like this functionality in the Integrated Portal as well.
... View more