Showing ideas with status New.
Show all ideas
Hello! When building objects and processes you sometimes realize you missed to place an action. The intuitive way for me to add an action earlier in the object/process:
Select what needs to be moved to make room and move it.
Place the new action where it is supposed to be.
Configure the action.
Draw new connecting line.
Step 2 is not possible in the way the tool works right now. If you drag a new action and place it on a line between two other actions, it simply disappears. Currently I place the action next to the line. Then drag it on top of the line and then finish the steps. Please allow us to place actions directly on top of the connecting lines.
... View more
There should be a queue showing which schedule is currently running and which tasks have been processed or are still being processed. Running schedules should be able to cancel. Currently only server service restart is the only option to kill running schedules
... View more
Currently the Blue Prism Application server cannot be load balanced (use F5 for example). We are required to have 1 server hot and the second cold (service stopped). We should be able to run hot/hot, that is both application servers active at the same time.
... View more
feature to create and save a connection between process and bot machine will help to get rid of dragging processes on bot machine by scrolling through the long lists of bot machines, feature can be introduces as a schedule without any timing, but can be ran manually whenever required
... View more
The first page of the discovery tool asks for the reason for automation, and one of the options is 'risk'. This then doesn't appear to be considered anywhere else within the tool or within the prioritisation matrix. Is there a way we can add these in somewhere to add weight to the prioritisation if the process is being automated on the basis of risk reduction rather than concentrating on FTE saving alone? Thanks
... View more